IEC 61439 Panels
Industries/Mining & Metals/Power Control Center (PCC)

Power Control Center (PCC) for Mining & Metals

IEC 61439 power control center (pcc) assemblies engineered for mining & metals applications. Heavy-duty IEC 61439 panel assemblies for mining operations and metals processing with extreme environmental and power requirements.

Power Control Center (PCC) assemblies for Mining & Metals are engineered low-voltage switchgear systems that combine high short‑circuit withstand, modularity, and environmental hardening to meet the sector’s extreme electrical and site conditions. Typical mining PCCs are built to IEC 61439-2 requirements, with system components complying with IEC 60947 series (60947-1, -2, -4-1) and auxiliary guidance from IEC 60068 (environmental testing), IEC 60529 (IP ratings) and IEC 60079 where explosive dust or gas hazards exist. Commercially proven platforms used as references include Siemens SIVACON, ABB MNS and Schneider Prisma Set; these product lines illustrate architectures—fixed, withdrawable, and draw‑out MCC modules—commonly applied in mining PCCs. Electrical design: Busbar systems are specified up to 6,300 A continuous with copper or copper‑clad aluminum conductors sized for thermal and mechanical stresses. Typical short‑circuit ratings range 65–120 kA (1 s) and are verified by calculation per IEC 61439-1/2 and IEC 60909. Forms of separation (Form 3b through 4b) are applied according to serviceability and maintenance needs: Form 3b (circuit separation with individual barriers) for safer feeder access, and Form 4b (full segregation of bus, feeders, and functional units) where maximal fault containment and maintainability are required. Protection and coordination: Design emphasizes selective protection coordination from transformer LV output to final circuits using IEC 60947‑2 low‑voltage circuit breakers, adjustable trip settings, time‑current curve matching, and upstream fault limiting devices. Arc‑flash risk analysis (IEEE 1584 or equivalent) drives mitigation—range of solutions includes arc‑resistant construction, pressure‑relief channels, remote racking, and fast trip I‑l sensors. Power quality needs—harmonic measurement and mitigation—are met using passive or active harmonic filters, tuned reactors and line reactors for VFDs; measurements adhere to IEC 61000‑4‑7 and IEC 61000‑4‑30 methodologies. Environmental and mechanical: Mining PCCs are engineered for -40 °C to +55 °C operation, high altitudes with derating considerations, heavy dust loads, vibration and shock. Enclosures are rated IP31–IP54 (upgradable to IP55/IP66 for washdown or corrosive environments), with corrosion resistance per ISO 12944 C4/C5 or stainless steel options. Seismic and vibration mounting, anti‑vibration fixings and reinforced bus supports are standard for conveyors, crushers and hoist installations. Functional integration: Modern mining PCCs integrate motor control (soft starters, VFDs), synchronous motor protection, central PLC/RTU controls, and advanced metering (Siemens SENTRON/Siemens PAC, ABB CMS/Meters, Schneider PowerLogic PM8000 family). Communications use Modbus TCP/RTU, Profibus, or IEC 61850 where plant/substation integration is required. Design verification includes thermal, dielectric and short‑circuit tests per IEC 61439-1/2, factory acceptance testing (FAT), and site verification for commissioning.

Key Features

  • High-capacity busbar system rated for full transformer output
  • Selective protection coordination from transformer to final circuits
  • Integrated power monitoring with demand management
  • Power quality analysis with harmonic measurement
  • Designed for mining & metals operating environments
  • Industry-specific protection and monitoring requirements

Technical Specifications

Rated Current (InA)Up to 6300A
Short-Circuit Rating (Icw)65–120kA / 1s
Rated Voltage690V AC
Form of SeparationForm 3b–4b
IP ProtectionIP31–IP54
IEC StandardIEC 61439-2
Target IndustryMining & Metals

Frequently Asked Questions

Request a Quote

Tell us about your panel requirements and our engineering team will get back to you within 24 hours.